Stakeholder map
Influence against interest, on a 3×3 lattice. Ruled ground.An actor on the timeline and a stakeholder on this map are the same person seen twice. The small sticky is already the right object, so the map costs one canvas and no new sticky type. The activity is the positioning: nobody argues about a name, they argue about whether Procurement really has high influence.
Horizontal axis, interest, left to right: LOW, MEDIUM, HIGH. Vertical axis, influence, top to bottom: HIGH, MEDIUM, LOW.
- Same sticky as an actor, same colour, same 120-wide geometry — scaled to the cell, never re-coloured.
- A stakeholder placed on the map and an actor used on the timeline are one object. Rename in either place, both change.
- Two positions for one person is the normal case, not an error. The proposed one is dashed at 72% and credited.
- Scope is optional: the whole change, or one bounded context. A stakeholder can sit high in one context and low in another.
- High influence, low interest is the cell that matters most in a change board. The facilitator names it out loud when someone lands there.
Horizontal axis, interest, left to right: LOW, MEDIUM, HIGH. Vertical axis, influence, top to bottom: HIGH, MEDIUM, LOW.